Dolomite Beach walang kuwentang proyekto – Legarda

The treatment plant wasn’t a “pre-closure priority” in the sense of being fully built and tested beforehand—it was an existing or hastily integrated facility that proved inadequate for the redirected flow. Nag focus agad sila sa pag block ng direct discharges bago amg upgrade ng water treatment. Saka hanapin mo yung RA 9275 for water quality, at PD 1067 for flood structures baka may mapulot ka na aral.

it means wala ka ngang alam sa mga wastewater treatment plants bossing, never pa ako nakakita ng treatment plant for flood waters haha jusko lerd, sa company ko dati masaya kami pag umulan kasi the flood will make our wastewater flow to the protected bodies of water without getting nuked by DENR